Electrical engineering in Rendsburg

Frequently asked questions about our electrical contractor

Appointments, inspections, costs and faults: we answer here in advance the questions we're most often asked over the phone – so you know where you stand before you even call.

Rendsburg, Am Kanal 8 Rendsburg-Eckernförde district Appointments by arrangement Residential, administration, commercial
Response to inquiries within 24 hours on business days
Fixed time window instead of an all-day wait – you receive it before the appointment
Cost estimate before work begins, with on-site measurement for larger projects
Inspection report for every E-Check, digital and on paper

Clarified in Advance

Answers to the most frequently asked questions

Most calls we receive revolve around the same four things: When can someone come, what does it cost, how long does it take, and how much dust will there be.

Before You Call

What Helps Us With Your Inquiry

The more precisely we know the starting situation, the more binding our response can be – and the less often a second site visit is needed.

  • What type of building it concerns: apartment, single-family home, multi-unit house or commercial unit
  • Year the electrical installation was built or last modernized, if known
  • Whether the distribution board already contains residual-current devices (RCDs) – a photo of the open panel is enough
  • In case of faults: whether a single circuit or the entire unit is affected
  • For rentals: who unlocks the property on site and at what number this person can be reached
  • Your preferred time frame, so we can schedule the time window accordingly
Installation tester with red and black measuring leads next to a completed inspection report on a workbench
Every inspection is measured and documented – the report stays with you.

Inspection Intervals

When Which Inspection Is Due

The deadlines differ depending on whether an apartment, a rented property or a business is being inspected – we specify them concretely for your property during the on-site measurement.

Scroll table sideways

PropertyRecommended IntervalWhat Is InspectedResult
Owner-occupied apartment or homeevery 4 yearsDistribution board, outlets, switches, protective conductor, RCD trippingInspection report with defect list
Rented apartment, property managementevery 4 years, common areas visually inspected annuallyadditionally stairwell, basement, exterior outletsReport per unit, summary report for the property
Commercial premises, office and retailevery 4 years, portable equipment annuallySystem plus equipment inspection with test labelReport and equipment register
After renovation or distribution board replacementone-time acceptance inspectionMeasurement of all new circuitsAcceptance report and circuit list

E-Check

How an Inspection Proceeds at Your Property

The E-Check is the standards-compliant inspection of your electrical system and connected devices according to DIN VDE 0100-600 and 0105-100. We work through it in five fixed steps, so that at the end you hold a comprehensible report in your hands – not just a checkmark. For an apartment of around 80 square meters, we estimate two to three hours on site.

Five Steps From the Doorbell to the Report

We examine the meter cabinet, distribution board, cable routes and visible installations. In doing so, we note the construction year, cable cross-sections, existing residual-current devices (RCDs) and obvious defects such as damaged outlets or unsecured terminal points.

Pricing

What Costs Depend On

We only provide a reliable figure once we know the system. For manageable jobs – relocating an outlet, connecting a light fixture, retrofitting an RCD – photos of the meter cabinet and the installation location are enough for us to give a solid estimate. For renovations, we visit beforehand to take measurements. You then receive a written quote with labor, materials and travel costs listed separately.

  • Condition of the existing installation: Classic neutral earthing, fabric-insulated cables or a missing protective earth conductor mean extra work, because entire circuits have to be rewired from scratch.
  • Accessibility: Empty conduits save hours. If no conduit is present, the wall type determines the effort – chasing into concrete takes considerably longer than into plasterboard or brick.
  • Scope of the distribution board: A new meter cabinet compliant with the network operator's TAB, including registration, is a separate item and requires a coordination appointment.
  • Materials: You choose the switch range, light fittings and components. There are noticeable differences between standard and designer lines, which we make transparent in the quote.
  • Scheduling pressure: Regular appointments are cheaper than work carried out outside normal working hours. We state weekend and night surcharges upfront on the phone.
  • Occupied premises: In occupied flats we plan for dust protection, interim cleaning and shorter power-off periods – this takes extra time but saves you having to move out.

Six questions we hear every day

Let's talk about your project

Briefly describe what you need -- Elektro Hansen will get back to you with an assessment.