
Guides on electrical engineering at home
We explain what's behind the meter cabinet, inspection sticker and renovation plan – in plain language, without standards jargon, and with examples from residential homes, rental properties and commercial units.
What this is about
Expert knowledge without the need for a technical dictionary
Most of the questions that reach us by phone come up again and again – about old wiring, inspection intervals, and what a renovation actually costs. We write the answers down here.
Electrical work in existing buildings is rarely a matter of right or wrong, but rather a matter of sequence. Anyone who knows that the meter cabinet comes before the new kitchen, and the RCD before the wallbox, saves themselves double work and torn-open walls.
That's why our articles don't just explain individual components, but also when an intervention is worthwhile and what it means for a typical house in Rendsburg.

Key topics
Three subject areas, four trade-related questions
Our articles revolve around the areas we work in every day: safety in existing installations, planned renovation, recurring inspections, and emergencies when the power goes out at night.

Safety in existing installations
How to recognise an outdated installation, why the RCD is the most important component, and what classic protective earthing ("Nullung") means.
Learn more
Planning a renovation
Order of trades, living through a renovation, partial vs. complete renovation – and when each approach pays off.
Learn more
Inspections and deadlines
E-Check, DGUV V3, testing of portable equipment: which deadline applies to whom and what must be recorded in the report.
Learn more
When the power fails
What you can check yourself before calling, when you should switch off immediately, and how our emergency service works.
Learn moreGuide articles
All articles at a glance
New articles arise from what we encounter on site – usually when the same question comes up for the third time in a week.
Reference
Inspection intervals at a glance
Anyone renting out a property or employing staff has inspection obligations. The following figures are guideline values from the relevant regulations – the binding deadline results from the risk assessment of the property.
Scroll table sideways
| What is inspected | Who is affected | Guideline value | Regulation |
|---|---|---|---|
| Fixed installation in a residential building | Owner, property management | every 4 years | DIN VDE 0105-100 |
| Fixed installation in commercial premises | Employer | every 4 years | DGUV Regulation 3 |
| Portable equipment in the office | Employer | every 24 months | DGUV Regulation 3 |
| Portable equipment on construction sites | Employer | every 3 months | DGUV Regulation 3 |
| Residual current device, function test | User themselves | every six months via test button | DIN VDE 0100-410 |
| Installation upon change of ownership or letting | Seller, landlord | as needed prior to handover | E-Check per VDE |
Asked frequently
Frequently asked reader questions on our guide topics
We regularly receive the same follow-up questions about our articles — mostly from Rendsburg and the surrounding area, often before a renovation or after a breaker has tripped. The following answers summarise what we explain in the workshop and on the phone. They don't replace an on-site inspection, but they do give you a solid assessment before you engage us.
Let's talk about your project
Briefly describe what it's about -- Elektro Hansen will get back to you with an assessment.
